Detalles del proyecto El nuevo edificio judicial de La Laguna ha sido diseñado por el arquitecto Angel García Palmas y ejecutado por la UTE Dragados y Constructora Herreña Fronpeca. El nuevo Palacio de Justicia tiene forma irregular y una superficie Continuar leyendo
The 21st of September 2011 the president of Madrid region inaugurated the new Torrejón hospital. Was built in only 18 months and since October 13th this hospital works full capacity. In this hospital are taken care of 136.000 inhabitants from Continuar leyendo
The CPs group has moved to the TecnoLeganés park. The 3000m2 builging will be a strong bioclimate architecture reference and an example of accesibility, sustainability and ecoefficiency in Madrid. CPs is an ingineering company directed to the transport sectors (railway Continuar leyendo
The municipality of Viana (Luanda) will welcome a brand new shopping center planned to open its doors in November. The complex located in the south of Luanda has 7 floors with 72 shops, restaurants and cinemas to receive about 1000 Continuar leyendo
The Sardinero hotel will be ready for next spring, the customers staying there will have the feeling to have moved back to the beginning of the 20th century, with the magic of 1915, because its remodelling is the exact copy Continuar leyendo
Fuerte Estepona suites SPA is a sea-front luxury hotel located 5 minutes from the Estepona center, between Sotogrande and Portobanus. It has 210 rooms and luxury 1,2 and 3 bedrooms apartments with and full equipped kitchen. Also has sport facilities Continuar leyendo
Detalles del proyecto El antiguo hotel La Canaria, situado en Patalavaca, fue adquirido en 2004 por la empresa Steigenberger. Este año ha sido renovado íntegramente, desde la estructura hasta la decoración y la amplitud de las habitaciones. Han sido 15 Continuar leyendo
The new power station and warehouse of groups from Valencia airport is located in the south area of the airport, closed the services area. This new power station will give power to all the airport in view of its second Continuar leyendo
In July 31st opened its doors the new IKEA in la Mareta. With 28 millones euros investment, this center was the first one that the Swedish company opened in Spain in 1981. After 10 years of procedures the new 6.300m2 Continuar leyendo
Between September and November of this year will open its doors the Alicante second supermarket Alcampo, going ahead from the opening date planned for the first quarter of 2013. With a 14.000m2 surface this center will be the biggest of Continuar leyendo
The shopping center Las Arenas in las Palmas de Gran Canaria is located inside the district of Puerto Canteras, in the area of el Rincón. Was inaugurated in 1993 with a commercial a 130.000m2 surface divided up into 5 floors, Continuar leyendo
The market in Barceló street is being built according to the project of the architects : Enrique Sobejano and Fuensanta Nieto, they were the winners of the tender called by the Madrid City Council. This project will have a Sports Continuar leyendo
The new Algemesí (Valencia) multi-purpose center is located by the Plá area, and has been subsidized with 3.209.000€ from European funds FEDER. This project developped by the Algemesí city council will be pioneer in energy efficiency, prepared and provided with Continuar leyendo
<The Aguilera Group Fire Fighting systems are present in Ciudad de la luz, the most modern cinema studio in Europe. Ciudad de la luz is an industrial complex with all the most advanced services in audiovisual production. With 6 shooting Continuar leyendo