Coca-Cola Distribution Company

In June 2012 started the first ground movements for the extension of the Leganés Business Parc stage II with the new logistic platform which Casbega, distribution company for Coca-cola has brought into operation.
Since September they are working full capacity, the new logistic platform has been built on 60.000m2, the building construction and the installations mechanization have a high technology distribution, storage and reception system.
The engineering company LKS Estudio, has planned the Aguilera Group Fire Fighting Protection systems which in turn has installed Elecnor, one 8 loops intelligent control panel with algorithmic technology AE/SA-C8 which is centralized in a remote control terminal AE/SA-TCR controlling 350 algorithmic devices and early detection (Aspiration System). In all our projects, the Aguilera Group has achieved the monitoring commitment and the collaboration for the start up of the equipments from our technical department.
In Aguilera Group we always work with the best technology to provide the best in security.